HomeworksTV » Job 15

With this Bathroom, The Old Bath, sink & toilet were removed.
The old rotten floor was also removed and replaced.
We fitted a 1000 x 800 Offset Quadrant shower & Triton T90z
A 1200 x 600 curved chrome radiator.
A 60cm Ella, wall hung, Vanity unit with a Quartz Mono Basin Mixer.
An Aragon 80 x 60 mirror.
A Tonique Back to wall toilet, with a slow close seat.

Before:

After: